ITALIAN FOUNDATIONS. DIGITAL AMBITION.

Infrastructure
for what’s next.

Connecting real estate, energy and development expertise to shape a new data centre opportunity in metropolitan Milan.

+
SAN GIULIANO MILANESE LOMBARDY / ITALY
ELITE / INFRASTRUCTURE STUDYCONCEPT
COMPUTE
POWER
CONNECTION
Architecture of possibility.Conceptual visualisation · not a project design
70 MWRequested grid connection
21,235 m²Approximate site area
Milan / ITSoutheast metropolitan location
DevelopmentProposed brownfield redevelopment

Project information as of November 2026. Requested grid capacity is not available power or IT load. Final scope is subject to technical, planning and grid confirmation.

01 / THE COMPANY

A physical foundation
for a digital future.

ELITE S.r.l. brings local real-estate participation and project coordination to infrastructure development in Italy.

We connect property opportunities with the needs of specialist operators, developers and investors. Our focus is the work that makes development possible: a clear asset perimeter, informed feasibility, coordinated infrastructure and a practical partnership structure.

Our role and development approach
FEATURED DEVELOPMENT OPPORTUNITYA new purpose for an established location.

02 / SAN GIULIANO MILANESE

Milan’s next chapter.
Grounded in place.

An existing property complex at Via Leone Tolstoj 86 is being evaluated for data centre redevelopment. The working direction brings together brownfield regeneration, high-voltage connection planning and an operator-led technical brief.

Location
Southeast metropolitan Milan
Development direction
Demolition and reconstruction under evaluation
Grid process
70 MW connection requested
Discover the project

03 / DEVELOPMENT PRIORITIES

Designed around the systems
that matter.

A data centre starts with the relationship between land, power, cooling and connectivity. Our development approach considers these systems together.

01

Power & infrastructure

High-voltage connection planning, phased demand and a clear distinction between grid import and usable IT capacity.

Explore
02

Operator-led design

Space, redundancy, rack density and cooling shaped by real workloads and specialist requirements.

Explore
03

Resource responsibility

Energy efficiency, water stewardship and feasible heat reuse considered from the earliest design stages.

Explore

04 / THE MILAN ADVANTAGE

Connected to
a growing ecosystem.

Milan brings together enterprise demand, established data centre operators, specialist services and interconnection infrastructure.

414 MW IT

Milan installed capacity reported by Politecnico di Milano in January 2026.

Read the market research
Explore the location
Milan metropolitan contextAn illustrative diagram places San Giuliano Milanese southeast of central Milan. It is not a geographical or parcel survey.MILANMetropolitan ecosystemSAN GIULIANO MILANESEVia Leone Tolstoj 86METROPOLITAN CONTEXT / SCHEMATIC, NOT TO SCALEN ↑

05 / FROM OPPORTUNITY TO DELIVERY

Progress through clear milestones.

An evidence-led development process aligns property, infrastructure, design and capital. Each stage advances against the requirements of the project and its partners.

01

Align

Define the partner’s capacity, delivery and commercial requirements.

02

Evaluate

Reconcile property control, planning, power and environmental conditions.

03

Design

Develop an operator-led masterplan, cost plan and coordinated approvals.

04

Deliver

Progress construction and commissioning against agreed milestones.

Explore partnership models

THE NEXT CONVERSATION

Build the next chapter.
With the right partners.

For data centre operators, infrastructure investors and development partners evaluating a position in Milan.

Start a conversation