ELITE / SAN GIULIANO MILANESE

An established place.
A new infrastructure purpose.

A proposed data centre redevelopment at Via Leone Tolstoj 86, in the southeast Milan metropolitan area. A project shaped by location, infrastructure and the requirements of its future operator.

70 MWRequested grid connection
21,235 m²Approximate site area
Milan / ITSoutheast metropolitan location
DevelopmentProposed brownfield redevelopment

Approximate areas and project particulars are subject to verification. The 70 MW figure is requested grid connection capacity, not secured electricity or confirmed IT capacity.

THE OPPORTUNITY

Regeneration
with a clear purpose.

The working development direction is demolition and reconstruction of an existing property complex, subject to property control, planning rights and technical feasibility.

A new layout can be evaluated around data halls, electrical systems, cooling, backup generation, access and supporting infrastructure. The final scheme should follow a coordinated site masterplan and a defined operator brief.

Existing gross building area is not treated as an automatic redevelopment entitlement. The lawful building envelope and any replacement floor area require reconciliation with the relevant titles and current planning instruments.

Download project overview

PROJECT PARAMETERS

The starting point. Clearly defined.

Public project overview · November 2026
ParameterCurrent project informationBasis
Project addressVia Leone Tolstoj 86, San Giuliano Milanese, Lombardy, ItalyReported project location
Land areaApproximately 21,235 m² / 2.1235 hectaresSubject to survey and title reconciliation
Existing footprintApproximately 5,500 m²Reported existing building footprint
Development approachDemolition and reconstruction under evaluationSubject to control, planning and feasibility
Requested grid capacity70 MWGrid import request; not IT load or energised capacity
Potential initial phase30–35 MW import conceptSeparate supply feasibility and confirmation required
IT capacity and PUETo be established through technical designNo adopted performance or capacity commitment
Service availabilityProgramme to be definedNo committed energisation or ready-for-service date

PROJECT STATUS

A development opportunity.
A disciplined path forward.

COORDINATION

Property & planning

Whole-site control, current planning instruments and the lawful redevelopment envelope are core diligence workstreams.

APPLICATION STAGE

Power connection

A 70 MW high-voltage connection application and an associated technical solution are reported. Acceptance, obligations and deliverability require current confirmation.

TO BE DEFINED

Design & delivery

Capacity, cooling, resilience, cost, phasing and delivery are to be developed with the prospective operator and specialist team.

MASTERPLAN PRIORITIES

Every system.
One coordinated site.

The reported land area alone does not establish fit for the headline connection request. A dimensioned masterplan is the essential next step.

PROJECT QUESTIONS

A closer look.

Is 70 MW already available?

No. The figure describes requested grid connection capacity. It does not represent currently available electricity, confirmed critical IT load or a contractual service date.

Is the existing building being converted?

Demolition and reconstruction is the current working direction. Final decisions depend on feasibility, planning rights, control of the relevant property and the operator’s requirements.

Is an initial 35 MW phase confirmed?

An initial 30–35 MW supply is a potential phasing concept. Separate network feasibility and written confirmation are needed before it becomes a delivery commitment.

Is the project permitted or certified?

The public information describes a development opportunity. It does not represent a fully approved design, a ready-to-build scheme or an awarded Tier certification.

How can a partner evaluate the opportunity?

Contact ELITE with your organisation, intended role, capacity requirements and timing. Relevant supporting information can be discussed through an agreed diligence and disclosure process.

THE NEXT CONVERSATION

Build the next chapter.
With the right partners.

For data centre operators, infrastructure investors and development partners evaluating a position in Milan.

Start a conversation